March Installations

adminsepticmanCentral & Metrowest MA

28 MAYNARD ST NORTHBORO – CULTEC SYSTEM INSTALLATION 3 MORNINGDALE AVE BOYLSTON-INFILTRATOR SYSTEM INSTALLATION 27 GULF STREET BOYLSTON-STONE SYSTEM INSTALLATION 214 OLD CONNECTICUT PATH WAYLAND – STONE SYSTEM INSTALLATION 9 HEMLOCK RD WAYLAND- LEACHING GALLEY SYSTEM INSTALLATION 240 PROSPECT STREETSHREWSBURY – SEWER CONNECTION

Sewer Connection – Shrewsbury

adminsepticmanShrewsbury

PRE-CONSTRUCTION PHOTO WITH MARKING OF PROPOSED LINE EXCAVATED TRENCH READY FOR LINE CONNECTION MADE TO TOWN SEWER LINE BACK-FILLED W/ STONE STEPS RETURNED TO PLACE